BP's Blue Hydrogen Production Hub in Teesside: Transforming UK's Industrial Landscape
Key Ideas
  • Costain's engineering team to deliver front-end engineering and design for a 31km hydrogen pipeline network in Teesside by 2025.
  • H2Teesside aims to be a major blue hydrogen production facility producing 160,000 tonnes of low carbon hydrogen annually to displace natural gas in industries.
  • Technip Energies chosen for FEED of the hydrogen production site to establish execution methodology, schedule, and costs by 2025.
  • BP's project in Teesside could help transform the region into a hydrogen hub, create jobs, and drive the UK's low carbon hydrogen economy.
BP's blue hydrogen production facility in Teesside, known as H2Teesside, is set to become one of the largest blue hydrogen production sites in the UK. Costain's engineering team is working on the front-end engineering and design for a 31km hydrogen pipeline network to distribute purified and dehydrated hydrogen to industrial end users. This project, part of the East Coast Cluster, is expected to produce 160,000 tonnes of low carbon hydrogen yearly, aiming to replace natural gas consumption in industries. Technip Energies will handle the FEED for the hydrogen production site to establish execution methodology, schedule, and costs. Costain's completion of the FEED for the onshore CO2 pipeline demonstrates its progress in decarbonization efforts. The project is expected to bring environmental benefits and create job opportunities in Teesside, contributing to the region's development. BP's investment in H2Teesside reflects the potential for Teesside to become a leading hydrogen hub in the UK, driving the country's low carbon hydrogen economy and decarbonizing the industrial sector.
ADVANCEH2

Our vision is to be the world's leading online platform for advancing the use of hydrogen as a critical piece needed to deliver net-zero initiatives and the promise of a clean H2 energy future.

© 2024 AdvanceH2, LLC. All rights reserved.