Stuttgart's Green Hydrogen Revolution: Funding Boost for HydroPulse Project
Key Ideas
  • Stadtwerke Stuttgart secures 5 million euros for the HydroPulse Stuttgart project, enhancing the city's hydrogen infrastructure.
  • The HydroPulse sub-project includes building hydrogen filling stations, fuel cell transporters, and a high-temperature fuel cell on the EnergyCampus.
  • The Green Hydrogen Hub Stuttgart aims to produce 1,000 tons of high-purity hydrogen annually from three electrolyzers by the end of 2026.
  • The project integrates a logistics concept for supplying industry, research, and two hydrogen filling stations, promoting regional hydrogen use.
Stadtwerke Stuttgart has received an additional five million euros in funding for the Green Hydrogen Hub Stuttgart project, specifically for the HydroPulse Stuttgart sub-project. This funding will be used to establish hydrogen filling stations and supply hydrogen to another station in the Stuttgart Neckar Valley, connected to the planned H2 GeNeSiS pipeline. Additionally, three fuel cell transporters and a high-temperature fuel cell will be procured and installed at the EnergyCampus in Stuttgart-Wangen. The Green Hydrogen Hub Stuttgart is set to produce 1,000 tons of high-purity hydrogen annually by the end of 2026. The regionally produced hydrogen will support heavy goods vehicles and other vehicles through the H2 filling stations and a logistics system, enhancing the city's hydrogen infrastructure. The overall project aims to integrate the transport, electricity, and heat sectors, making significant strides towards a sustainable energy transition and economic development in the region.
ADVANCEH2

Our vision is to be the world's leading online platform for advancing the use of hydrogen as a critical piece needed to deliver net-zero initiatives and the promise of a clean H2 energy future.

© 2024 AdvanceH2, LLC. All rights reserved.