Eskom Invites Tenders for Hydrogen Plant Refurbishment at Kusile Power Station
Key Ideas
  • Eskom Holdings in South Africa is inviting tender submissions for the refurbishment and commissioning of a Hydrogen Plant at Kusile Power Station.
  • The deadline for tender submission is set for 1 July 2024 at 10am, and late tenders will not be accepted.
  • Tenders must be hand-delivered to the Eskom tender box at the specified physical address, and no emailed or faxed tenders will be considered.
  • For further details and access to the tender documents, interested parties can reach out to the Eskom Representative, Martha Masemula.
Eskom Holdings SOC Ltd, a South African state utility, has issued an invitation for tender submissions related to the refurbishment and commissioning of a Hydrogen Plant at the Kusile Power Station located in Emalahleni/Witbank. The deadline for submitting tenders is 1 July 2024 at 10am, and late submissions will not be accepted. Interested parties are required to physically hand-deliver their tenders to the Eskom tender box at the specified address, with emailed or faxed tenders being ineligible. The tender has been delegated to the Eskom Representative, Martha Masemula, who can be reached for further details. This opportunity presents a significant project within the energy sector of South Africa, offering opportunities for companies in the market. Access to the original Eskom tender documents is essential for potential bidders to understand the scope and requirements of the project. The initiative indicates a positive step towards enhancing the infrastructure and capabilities of the Kusile Power Station, ultimately contributing to the energy landscape in the region and potentially fostering advancements in hydrogen technology.
ADVANCEH2

Our vision is to be the world's leading online platform for advancing the use of hydrogen as a critical piece needed to deliver net-zero initiatives and the promise of a clean H2 energy future.

© 2024 AdvanceH2, LLC. All rights reserved.