Wartsila Launches World's First Large-Scale 100% Hydrogen-Ready Engine Power Plant
Key Ideas
  • Wartsila has introduced the first large-scale 100% hydrogen-ready engine power plant, capable of running on natural gas and hydrogen blends.
  • The Wartsila 31 engine platform is highly efficient, synchronizing with the grid rapidly and offering superior load-following capabilities.
  • President of Wartsila Energy sees this development as a significant step towards achieving 100% renewable power systems in the future.
  • The hydrogen-ready engine is set to be available for orders in 2025 with deliveries starting from 2026.
Wartsila, a leading company in engine technology, has unveiled the world's first large-scale 100% hydrogen-ready engine power plant. This innovative plant can operate on a mixture of natural gas and 25% hydrogen blends, showcasing a commitment to sustainable energy solutions. The Wartsila 31 engine platform, on which the hydrogen-ready power plant is based, is lauded as the most efficient globally, boasting rapid grid synchronization, fuel flexibility, superior load-following capabilities, and high part load efficiency. With over 1 million running hours and 1,000 MW installed capacity worldwide, it has proven its reliability and performance. Anders Lindberg, President of Wartsila Energy, emphasized the significance of this milestone in advancing the energy transition towards renewable power systems. The 100% hydrogen-ready engine is scheduled to be open for orders by 2025, marking a pivotal moment in the adoption of hydrogen technology for power generation.
ADVANCEH2

Our vision is to be the world's leading online platform for advancing the use of hydrogen as a critical piece needed to deliver net-zero initiatives and the promise of a clean H2 energy future.

© 2024 AdvanceH2, LLC. All rights reserved.