Innovative Hydrogen Production Facility Planning in Norway
Key Ideas
  • Hystar AS awards thyssenkrupp Automation Engineering the FEED contract for an automated electrolyzer manufacturing line in Norway.
  • The new production line in Høvik will increase efficiency, scaling up capacity for large-scale green hydrogen projects.
  • The factory's compact design and utilization of an established supply chain enable rapid production capacity expansion.
  • CEOs of Hystar and thyssenkrupp express excitement for the partnership and the positive impact on the global energy transition.
Hystar AS, based in Høvik, Norway, has recently awarded thyssenkrupp Automation Engineering with the Front-End Engineering Design (FEED) contract for an automated electrolyzer manufacturing line. This strategic move is part of Hystar's expansion plans to enhance efficiency and increase production capacity for large-scale green hydrogen projects. The upcoming production line, set to be located in Høvik, will occupy a minimal footprint of 2,500 m2, covering crucial operations like stack assembly, quality control, and testing. By leveraging components from established high-volume suppliers, Hystar aims to swiftly scale up its capacity, showcasing its commitment to the global energy transition. Fredrik Mowill, CEO of Hystar, and Michael Menneking, CEO of thyssenkrupp Automation Engineering, have both expressed optimism about the collaboration, highlighting the significance of this partnership in driving progress within the hydrogen industry.
ADVANCEH2

Our vision is to be the world's leading online platform for advancing the use of hydrogen as a critical piece needed to deliver net-zero initiatives and the promise of a clean H2 energy future.

© 2024 AdvanceH2, LLC. All rights reserved.